Power infrastructure projects in Bangladesh


Syed Amar Khan
 Share

Recommended Posts

https://www.dhakatribune.com/business/2021/08/17/nasrul-hamid-breb-rural-consumers-have-reached-31-8-million

Nasrul Hamid: BREB rural consumers have reached 31.8 million

 UNB

 Published at 06:23 pm August 17th, 2021

Power sector is playing a vital role in implementing the 'My Village-My City' program to fulfil the pledges of the prime minister, he says 

The number of consumers under the Bangladesh Rural Electrification Board (BREB) in the country’s rural areas has reached 31.8 million, State Minister for Power, Energy and Mineral Resources Nasrul Hamid said on Tuesday. 

He also urged the power officials to improve their services to satisfy consumers.

“Achieving customer satisfaction should be our main target now. You have to provide improved services to the doorsteps of the consumers,” he said while addressing a webinar organized by the BREB to observe the National Mourning Day 2021.   

The virtual seminar, with BREB Chairman Maj Gen (retd) Moin Uddin in the chair, was addressed by Power Secretary Habibur Rahman and Power Cell Director General Mohammad Hossain.

Hamid said the Father of the Nation Bangabandhu Sheikh Mujibur Rahman had taken various steps to provide electrification services to the rural areas considering the economic development of the rural people.  

“Erasing the difference between the urban and rural areas was the main goal of Bangabandhu,” he said, adding that Prime Minister Sheikh Hasina has been working to achieve the goal through expanding modern amenities to the villages.

The state minister said the power sector has been playing a vital role in implementing the “My Village-My City” program to fulfil the pledges of the prime minister.    

He also directed the BREB officials to use improved technologies in rural electrification as well as to encourage people to use energy-efficient appliances for ensuring economic consumption of power.

Link to comment
Share on other sites

https://thefinancialexpress.com.bd/national/bangladesh-close-to-100pc-electricity-coverage-1629466292

Bangladesh close to 100pc electricity coverage

 BSS | Published:  August 20, 2021 19:31:33

1629466293.jpg

Bangladesh has edged close to cent per cent electrification, as around 99.5 per cent of people have already come under electricity coverage, which was only 47 per cent in 2009.

"Incredible success was achieved in the electricity and power sector as we are supplying power to 99.5 per cent of our population," said State Minister for Power, Energy and Mineral Resources Nasrul Hamid.

 Since 2009, the country is managed to generate an additional 20,293 megawatts of electricity, raising the total output to 25,235 megawatts, he said.

 "We're highly optimistic that the remaining 0.5 per cent population will get electricity by this year," he added.

 Nasrul said that the government has undertaken a crash programme in 2016 in line with 'Sheikh Hasina's initiative-electricity in every house' project.

 Under the project, supply of electricity will have to be ensured to every house by 2021, he said, adding that the project will be completed this year.

 According to the latest data of power cell, the power generation capacity of Bangladesh now stands at 25,235 MW, with power connections increasing to 40.7 million. The number of power plants is now 146. The government is now importing 1160 MW electricity from India.

Power and Energy experts said that Bangladesh has already been included in the list of countries in South Asia that have brought 100 per cent people under electricity coverage.

According to the World Bank, 100 per cent of the people in Sri Lanka, Maldives and mountainous Bhutan have brought all people under electricity coverage in 2019.

Bangladesh Awami League promised to ensure a comprehensive long term policy on electricity and energy and economic usage of oil, gas, coal, hydropower, wind power and solar energy before national polls.

In its promise, big and small power generation units, coal extraction, and oil and gas exploration are supposed to be given priority.

The government has already reached electricity to the off-grid population of Sandwip by installing submarine cables under the bottom of the sea.

People of the remote char Ramkantpur of Sujanagar in Pabna are also getting power that has changed their life standard as people there are running small scale rice mills, poultry farms and electricity-driven vehicles.

According to the World Bank data in 2019, electricity coverage reached 92.2 per cent in Bangladesh, 97.2 per cent in India, 73.9 per cent in Pakistan and 97.7 per cent in Afghanistan.

But, now Bangladesh has brought 99.5 per cent of its population under electricity coverage, while the rest of the people will come under its coverage within this year.

Talking to BSS, International Energy Consultant Khondkar Abdus Saleque Sufi said people's access to power across the country particularly in rural areas has a major positive impact on the agricultural economy.

"The use of modern machinery has increased in agricultural production. This has created new avenues of livelihood. However, if electricity becomes affordable and uninterrupted, it will contribute more to economic growth," he added.

Bangladesh has made significant progress in ensuring people's access to electricity as the power coverage reached 99.5 per cent mainly because of stronger political commitment of the Awami League government led by Prime Minister Sheikh Hasina, said an energy expert.

"Access to quality and reliable electricity is no more a dream as the government has been working round the clock to make Bangladesh a developed one by 2041," said state minister for energy Nasrul.

Link to comment
Share on other sites

  • 2 weeks later...

https://www.tbsnews.net/bangladesh/energy/bpdb-transfer-entire-desco-stake-dpdc-296401#.YS-pSDodvMA.facebook

TBS Report

01 September, 2021, 09:30 pm

Last modified: 01 September, 2021, 09:36 pm

BPDB to transfer entire Desco stake to DPDC

The transfer will take place outside the stock exchange’s trading system

 

Bangladesh Power Development Board (BPDB) is going to transfer all of its 67% stake in Dhaka Electric Supply Company (Desco) Ltd to Dhaka Power Distribution Company Ltd, a younger sibling of the listed power distribution company.

"As per government order, BPDB is transferring the entire Desco stake," said Kazi Ashraful Hoque, BPDB's finance and accounts controller.

The transfer process has already been initiated, he told The Business Standard.

Desco informed its shareholders that the company's sponsor, BPDB, owns nearly 26.38 crore of its 39.76 crore paid-up shares with a face value of Tk10 each.

The entire stake transfer is to take place outside the stock exchange's trading system with the approval of the Bangladesh Securities and Exchange Commission (BSEC).

Both Desco and DPDC are spin offs of the now defunct Dhaka Electric Supply Authority (Desa).

Desa, an autonomous body, was formed in the early 1990s to take over the power distribution network of Dhaka city and some surrounding areas, from the then Power Development Board (PDB).

As the government preferred a company structure instead of autonomous bodies, ultimately Desa handed over all of its assets and liabilities to two state-owned companies – Desco and DPDC.

Desco operates in the northern part of Dhaka while DPDC serves the southern part of the city.

After Desco, DPDC took over the remaining everything from Desa and began commercial operation in mid-2008 to abolish its ancestor Desa.

Desco, listed in 2006, now has its paid-up capital of nearly Tk400 crore.

Link to comment
Share on other sites

https://www.banglarunnoyon.net/national-news/44075

বাড়ি বাড়ি ঘুরে ২১ লাখ সংযোগ

ডেস্ক রিপোর্ট

প্রকাশিত: ২ সেপ্টেম্বর ২০২১  

শুরুটা ঝিনাইদহের হরিণাকুণ্ডু উপজেলায়। বাড়ি বাড়ি যেতে শুরু করে একটি ভ্যান। কেউ চাইলেই তার বাড়িতে দিয়ে দেয় বিদ্যুৎ–সংযোগ, মাত্র পাঁচ মিনিটে। চার দিনে এভাবে সংযোগ পান ৫৪ জন গ্রাহক। এরপর এটি বন্ধ হয়ে যায়। এক সপ্তাহ পর শুরু হয় আবার; এবার সারা দেশে। ভ্যান থেকে গত আড়াই বছরে ঘরে বসে বিদ্যুৎ–সংযোগ পান প্রায় ২১ লাখ গ্রাহক।

বাড়ি বাড়ি ঘুরে বেড়ানো এই ভ্যানের নাম ‘আলোর ফেরিওয়ালা’। ২০১৮ সালের ২৪ ডিসেম্বর এটি শুরু করেন পল্লী বিদ্যুতায়ন বোর্ডের (আরইবি) সহকারী মহাব্যবস্থাপক শেখ আবদুর রহমান। দুর্নীতি কমাতে মধ্যস্বত্বভোগীর হাত থেকে গ্রাহকদের সুরক্ষায় এমন ধারণা আসে তাঁর মাথায়।

আরইবি বলছে, ২০১৯ সালের জানুয়ারি থেকে গত জুলাই পর্যন্ত সারা দেশে নতুন বিদ্যুৎ–সংযোগ পেয়েছেন ৭৪ লাখ ৭৯ হাজার ৭৫৫ জন গ্রাহক। এর মধ্যে বাড়ি বাড়ি গিয়ে আলোর ফেরিওয়ালা বিদ্যুৎ–সংযোগ দিয়েছে ২০ লাখ ৫৮ হাজার ৪৪৩টি। তার মানে ২৭ দশমিক ৫২ শতাংশ সংযোগ এসেছে এভাবে।

আবদুর রহমান এখন আরইবির উপমহাব্যবস্থাপক, কাজ করেন বাগেরহাটের চিতলমারী উপজেলায়। তিনি বলেন, শুরু করার চার দিন পর জাতীয় সংসদ নির্বাচনের কারণে আলোর ফেরিওয়ালা সেবাটি বন্ধ হয়ে যায়। এরপর ২০১৯–এর ৩ জানুয়ারি প্রথম আলোয় এ সেবা নিয়ে একটি প্রতিবেদন প্রকাশিত হয়। ওই দিনই এক অনলাইন সভার মাধ্যমে সারা দেশের কর্মকর্তাদের এ কর্মসূচি চালুর নির্দেশনা দেন আরইবি চেয়ারম্যান।

এ বিষয়ে আরইবির চেয়ারম্যান মঈন উদ্দিন বলেন, শতভাগ বিদ্যুতায়নে অন্যতম ভূমিকা রেখেছে আলোর ফেরিওয়ালা। এটি একটি সরাসরি সেবা। সারা দেশে ছড়িয়ে পড়েছে আলোর ফেরিওয়ালা। একটি বাড়িও যাতে বিদ্যুৎ–সংযোগের বাইরে না থাকে, সেই চেষ্টা করা হচ্ছে।

আরইবি বলছে, সারা দেশে এ সংস্থার আওতায় পল্লী বিদ্যুৎ সমিতি আছে ৮০টি। প্রতি সমিতির আওতায় ১০টি করে ভ্যান নামানো হয়। গ্রামে গ্রামে ঘুরে বেড়ায় ৮০০ ভ্যান। এর ফলে নতুন বিদ্যুৎ–সংযোগ কর্মসূচি বাড়তি গতি পায়। নতুন সংযোগের পাশাপাশি বিভিন্ন ধরনের গ্রাহকসেবা দেওয়া হয় এসব ভ্যান থেকে। বিদ্যুৎ বিভাগ বলছে, দেশের সবচেয়ে বড় বিদ্যুৎ বিতরণকারী প্রতিষ্ঠান আরইবি। দেশে বর্তমানে চার কোটি বিদ্যুৎ গ্রাহকের মধ্যে ৩ কোটি ১৬ লাখের বেশি গ্রাহক আরইবির। মুজিব বর্ষে শতভাগ বিদ্যুতায়নের লক্ষ্যমাত্রায় বড় ভূমিকা রেখেছে এ সংস্থা। ২০১৯ সালে বিদ্যুৎ বিভাগের ‘সেরা উদ্ভাবনী’ কর্মসূচির পুরস্কার পেয়েছে আলোর ফেরিওয়ালা।

দেশের মোট ৪৬২টি উপজেলায় কাজ করছে আরইবি। এর মধ্যেই একটি সৌরবিদ্যুতের আওতায়। বাকি ৪৬১টির মধ্যে ২৮৮টি উপজেলাকে আনুষ্ঠানিকভাবে শতভাগ বিদ্যুতায়িত ঘোষণা করা হয়েছে। শতভাগ বিদ্যুতায়িত বাকি ১৭৩টি উপজেলা আগামী ১২ সেপ্টেম্বর প্রধানমন্ত্রীর উদ্বোধন করার কথা রয়েছে।

বিদ্যুৎ, জ্বালানি ও খনিজ সম্পদ প্রতিমন্ত্রী নসরুল হামিদ বলেন, বিনা পয়সায় বিদ্যুৎ পাওয়ার ধারণাটাই গ্রামের মানুষের ছিল না। তাই আরইবিকে ঘরে ঘরে গিয়ে বিদ্যুৎ–সংযোগ দেওয়ার নির্দেশনা দেওয়া হয়েছিল। এর মধ্য দিয়ে অবৈধ লেনদেনের সুযোগ উঠে গেছে। আলোর ফেরিওয়ালা চালু থাকবে। অন্য বিতরণ কোম্পানিগুলোকেও এটি চালু করতে নির্দেশনা দেওয়া হয়েছে।

৫ মিনিটে বিদ্যুৎ–সংযোগ
আরইবি বলছে, একটি মোটরচালিত ভ্যানে করে মিটার, সার্ভিস ড্রপ তার, অফিশিয়াল রসিদ বই, জামানত জমা গ্রহণের রসিদ বই, আবেদন ফরম, দুজন লাইনম্যান, একজনজন ওয়্যারিং পরিদর্শক বা একজন জুনিয়র ইঞ্জিনিয়ার প্রয়োজনীয় যন্ত্রপাতিসহ গ্রাহকের দরজায় গিয়ে আবেদন গ্রহণ করেন। সব তথ্য, কাগজপত্র, ওয়্যারিং যাচাই করে সঠিক থাকলে প্রয়োজনীয় নির্ধারিত ফি স্পটেই গ্রহণ করে পাঁচ মিনিটের মধ্যে গ্রাহকের নতুন সংযোগ প্রদান করে। সংযোগ দেওয়ার পাশাপাশি গ্রাহকদের বিভিন্ন রকম সমস্যার তাৎক্ষণিক সমাধান দিচ্ছে আলোর ফেরিওয়ালা।

ঢাকায় ১০ দিন পর বন্ধ!
গত বছর মার্চের শুরুতে রাজধানীতে ফেরি করে বিদ্যুৎ–সেবা চালু করে ঢাকা পাওয়ার ডিস্ট্রিবিউশন কোম্পানি লিমিটেড (ডিপিডিসি)। এতে নতুন সংযোগ দেওয়ার পাশাপাশি নানা সচেতনতামূলক প্রচার চালানো হয় ভ্যান থেকে। বিশেষ করে দুর্ঘটনা প্রতিরোধে গ্রাহকদের সচেতন করতে বিভিন্ন পরামর্শ দেওয়া হয়। ১৮টি বিতরণ সেবা অঞ্চলে তিনটি মিনি ট্রাকে করে এ সেবা চালু করা হয়। টানা ১০ দিন ধরে চলা এ কর্মসূচিতে প্রায় আড়াই হাজার গ্রাহক ঘরে বসে বিদ্যুৎ–সংযোগ পান। এরপর করোনা সংক্রমণ পরিস্থিতির জন্য সারা দেশে সাধারণ ছুটি ঘোষণার পর এটি বন্ধ হয়ে যায়। এ বিষয়ে ডিপিডিসির ব্যবস্থাপনা পরিচালক বিকাশ দেওয়ান বলেন, ফেরি করে গ্রাহকের কাছে যাওয়ার কারণে ভালো সাড়া পাওয়া গেছে। নতুন সংযোগ, লোড বৃদ্ধি, মিটার পরিবর্তন, ভুল সংশোধনসহ সব ধরনের সেবা দেওয়া হয়েছে। করোনা পরিস্থিতি স্বাভাবিক হয়ে এলে এ কর্মসূচি আবার চালু করা হবে।

দালালের হাত থেকে সুরক্ষা
বিদ্যুৎ খাতের ১ হাজার ৪০০ গ্রাহকের ওপর জরিপ চালিয়ে গত মে মাসে একটি প্রতিবেদন দেয় রাষ্ট্রায়ত্ত প্রতিষ্ঠান ইনফ্রাস্ট্রাকচার ইনভেস্টমেন্ট ফ্যাসিলিয়েশন কোম্পানি (আইআইএফসি)। এতে দেখা যায়, ৫২ শতাংশ গ্রাহক বিদ্যুৎ-সংযোগ নেন মধ্যস্বত্বভোগী বা দালালের মাধ্যমে। মধ্যস্বত্বভোগীর এমন দৌরাত্ম্য বন্ধ করে জনগণের দোরগোড়ায় সেবা পৌঁছে দিতে আলোর ফেরিওয়ালার মতো কর্মসূচি চালু থাকা দরকার বলে মনে করেন সংশ্লিষ্ট ব্যক্তিরা।

কনজ্যুমারস অ্যাসোসিয়েশন অব বাংলাদেশের (ক্যাব) জ্বালানি উপদেষ্টা এম শামসুল আলম বলেন, অধিকাংশ সংযোগ হয়েছে আলোর ফেরিওয়ালার বাইরে। সেখানে তো অনিয়ম বন্ধ করা যায়নি। সংযোগ দিলেও নিরবচ্ছিন্ন বিদ্যুৎ নিশ্চিত করা যায়নি। তাদের বিতরণ ব্যয় বাড়ছে। তিনি আরও বলেন, প্রান্তিক জনগোষ্ঠীকে আরও বেশি সেবা দিতে আরইবিকে শহর এলাকায় তাদের সম্প্রসারণ বন্ধ করতে হবে। আরইবিকে ব্যবসায়ী বানানোর চিন্তা করলে বিদ্যুৎ খাতে সরকারের গর্ব করার মতো আর কিছু থাকবে না।

Link to comment
Share on other sites

https://thefinancialexpress.com.bd/national/five-power-plants-to-be-inaugurated-on-september-12-1630759925

Five power plants to be inaugurated on September 12

Published:  September 04, 2021 18:52:06 | Updated:  September 05, 2021 08:49:36

Five power plants, having a total of 879 MW electricity generation capacity, will be inaugurated on September 12.

"Prime Minister Sheikh Hasina will inaugurate these power plants through a video conference from Ganabhaban at 10:00 am on that day," Saiful Islam, a director (public relations) of the Bangladesh Power Development Board (BPDB), said on Saturday.

He said the five power plants are Bibiyana-III 400 MW Combined Cycle Power Plant in Habiganj, Zulda, Chattogram 100 MW Power Plant Unit-2, Meghnaghat 104 MW Power Plant in Narayanganj, Modhumoti 100 MW Power Plant in Bagerhat and up-gradation of Sylhet 150 MW Power Plant to 225 MW Combined Cycle Power Plant in Sylhet, reports BSS.

According to the power ministry, the government has successfully constructed 119 power plants having a capacity of electricity production of 20,293 MW after assuming power in 2009.

It said the government had a target to generate 24,000 MW of electricity by 2021, but in the meantime, the target has already been exceeded.

Nasrul Hamid, the state minister for power, energy and mineral resources, said the electricity generation capacity reached 25,235 MW now (including captive power) which was 4,942 MW in 2009.

"We have brought around 99.5 per cent of the population under electricity facilities due to the bold and dynamic leadership of Prime Minister Sheikh Hasina," he said.

Nasrul Hamid said the Awami League-led government has achieved tremendous successes in the power sector during its last 12 years and has given top priority to the development of the sector considering its importance in the overall enhancement of the country.

"With sincere and relentless efforts by the government, the per capita electricity generation reached to 560 kWh, which was only 220 kWh in 2009. And the system loss brought down to 8.49 per cent from 14.33 per cent," he added.

Link to comment
Share on other sites

https://thefinancialexpress.com.bd/national/cabinet-approves-5-yr-extension-of-special-provision-for-quick-energy-supply-1630927097

Cabinet approves 5-yr extension of special provision for quick energy supply

Published:  September 06, 2021 17:18:17 | Updated:  September 06, 2021 17:24:19

The cabinet on Monday cleared a proposal for the extension of the Quick Enhancement of Electricity and Energy Supply (Special Provision) Act 2010 for another five years till 2026.

The approval came from the virtual cabinet meeting held with Prime Minister Sheikh Hasina in the chair, reports UNB.

The PM joined it from her official residence Ganobhaban. Other cabinet members were connected with the meeting from the Bangladesh Secretariat.

"Since the tenure of the existing law is going to expire in 2021, the proposed law was brought to extend it by another five years till 2026," said Cabinet Secretary Khandker Anwarul Islam while briefing reporters after the meeting.

He said the cabinet gave the final approval to the draft of Quick Enhancement of Electricity and Energy Supply (Special Provision) (Amendment) Bill, 2021 in order to ensure uninterrupted supply of electricity and energy for the sake of making Bangladesh into a higher middle-income country by 2030 and a developed country by 2041.

The tenure of the special provision, enacted in 2010, was extended on several occasions in the past, he said.

"But no change other than time extension has been made to the proposed law," said the Cabinet Secretary.

Besides, the Cabinet gave the final approval to the draft of Public Debt Bill, 2021 to make the existing as a time-befitting one.

Anwarul Islam said the Public Debt Act 1944 is a very old law, which was extended on several occasions. "Since the debt system witnessed a radical change, the Finance Division designed the new law," he said.

According to the proposed law, the government will give a precise guarantee against the debt taken by the government from the people that they would get back the deposited money anyhow, he said.

New provision was also incorporated in the draft law for running a Shariah-based deposit system alongside the normal deposit system, said the Cabinet Secretary, adding the public would be informed about the profits or interest against their deposits.

If anyone does not provide false information in obtaining the issued certificates under the government security and saving certificate schemes, he or she would face maximum six-month imprisonment, Tk 100,000 fine or both.

The meeting also approved in principle the draft of Bangladesh Police (Subordinate Employees) Welfare Fund Bill, 2021 to replace an ordinance promulgated during the military regime.

Link to comment
Share on other sites

https://bonikbarta.net/home/news_description/274296/আজ-৫-বিদ্যুৎকেন্দ্র-উদ্বোধন-করবেন-প্রধানমন্ত্রী

আজ ৫ বিদ্যুৎকেন্দ্র উদ্বোধন করবেন প্রধানমন্ত্রী

নিজস্ব প্রতিবেদক

সেপ্টেম্বর ১২, ২০২১

প্রধানমন্ত্রী শেখ হাসিনা আজ মোট ৭৭৯ মেগাওয়াট বিদ্যুৎ উৎপাদনে সক্ষম পাঁচটি বিদ্যুৎকেন্দ্র উদ্বোধন করবেন। সকাল ১০টায় গণভবন থেকে ভিডিও কনফারেন্সিংয়ের মাধ্যমে এ বিদ্যুৎকেন্দ্রগুলো উদ্বোধন করবেন তিনি। বাংলাদেশ বিদ্যুৎ উন্নয়ন বোর্ড (বিপিডিবি) সূত্রে এ তথ্য জানা গেছে।

বিদ্যুৎকেন্দ্রগুলোর মধ্যে রয়েছে হবিগঞ্জের জুলদায় বিবিয়ানা-৩ ৪০০ মেগাওয়াট কম্বাইন্ড সাইকেল বিদ্যুৎকেন্দ্র, চট্টগ্রাম ১০০ মেগাওয়াট বিদ্যুৎকেন্দ্র ইউনিট-২, নারায়ণগঞ্জে মেঘনাঘাট ১০৪ মেগাওয়াট পাওয়ার প্লান্ট, বাগেরহাটে মধুমতি ১০০ মেগাওয়াট বিদ্যুৎকেন্দ্র এবং সিলেটের ১৫০ মেগাওয়াট বিদ্যুৎকেন্দ্র থেকে ১৫০ মেগাওয়াট কম্বাইন্ড সাইকেল বিদ্যুৎকেন্দ্রে উত্তরণ।

উদ্বোধনী অনুষ্ঠানে বিদ্যুৎ ভবনের বিজয় হল থেকে যোগ দেবেন প্রধানমন্ত্রীর বিদ্যুৎ ও জ্বালানি উপদেষ্টা ড. তৌফিক-ই-এলাহী চৌধুরী বীর বিক্রম, বিদ্যুৎ, জ্বালানি ও খনিজ সম্পদ প্রতিমন্ত্রী নসরুল হামিদ, বিদ্যুৎ, জ্বালানি ও খনিজ সম্পদবিষয়ক সংসদীয় স্থায়ী কমিটির চেয়ারম্যান ওয়াসেকা আয়েশা খান, জ্বালানি বিভাগের সিনিয়র সচিব মো. আনিসুর রহমান, বিদ্যুৎ সচিব মো. হাবিবুর রহমান ও বিপিডিবির চেয়ারম্যান। গণভবন থেকে প্রধানমন্ত্রীর মুখ্য সচিব ড. আহমদ কায়কাউস উপস্থিত থাকবেন।

বিদ্যুৎ মন্ত্রণালয়ের তথ্যমতে, ২০০৯ সাল থেকে সরকার ২০ হাজার ২৯৩ মেগাওয়াট বিদ্যুৎ উৎপাদনে সক্ষম ১১৯টি বিদ্যুৎকেন্দ্র নির্মাণ করেছে। ২০২১ সাল নাগাদ ২৪ হাজার মেগাওয়াট বিদ্যুৎ উৎপাদন সক্ষমতা অর্জনের লক্ষ্যমাত্রা নির্ধারণ করা হয়েছিল। এরই মধ্যে লক্ষ্যমাত্রা ছাড়িয়ে গেছে বিদ্যুৎ উৎপাদন সক্ষমতা।

বিদ্যুৎ, জ্বালানি ও খনিজ সম্পদ প্রতিমন্ত্রী নসরুল হামিদ জানান, বর্তমানে বিদ্যুৎ উৎপাদন সক্ষমতা ২৫ হাজার ২৩৫ মেগাওয়াটে পৌঁছেছে। ২০০৯ সালে এটি ছিল ৪ হাজার ৯৪২ মেগাওয়াট।

Link to comment
Share on other sites

http://tbsnews.net/bangladesh/energy/pm-outlines-how-electricity-driven-economy-emerge-301600

TBS Report

12 September, 2021, 10:35 pm

Last modified: 12 September, 2021, 10:45 pm

PM outlines how electricity-driven economy to emerge

She also emphasises giving importance to the environment while taking up any development project

5_new_power_plants-01.png?itok=-RTWludt&

Prime Minister Sheikh Hasina has envisioned an electricity-run transport system – electric trains, buses and cars – to match the country's overall development activities.

To complement the upcoming development plans, she on Sunday said the country will continue to add new power plants.

"Electricity-run metro rail will start its operation soon and electric buses will gradually be introduced in the future. We will be able to manufacture electric cars in our country and our rail system will also be shifted to electricity," the PM said while virtually inaugurating five power plants that add 779 megawatts to the national grid.

The latest inauguration has pushed up the country's on-grid power generation capacity to 22,000MW, while the demand hovers between 11,500MW and 13,000MW.

But this demand gap is temporary. The prime minister noted that the government has several long-term plans to turn the country into a developed country. These plans include a Perspective Plan, Vision-2041 and Delta Plan.

Implementing these plans will push up energy demands quickly and so the government will continue rolling out new power projects.

Emphasising uninterrupted power supply, the PM said the transmission lines have to be set up alongside increasing the production to meet the demand.

"So, we are constructing the transmission lines as well," she said.

The premier said the government's main aim is to provide electricity extensively to rural areas so the scope of employment generation increases.

She continued, "The overall development of rural people is on top of our priority list and that is why we have given the highest importance to communication and power lines."

"Along with the electricity generation capacity growth, the people's electricity consumption has also increased," Sheikh Hasina noted at the inaugural function.

Rural people are now enjoying urban facilities because of electricity access, which is their constitutional right too, she added.

However, she urged the people to maintain austerity in using electricity to repay most of the government's huge subsidy to power generation.

"The government has been providing a huge subsidy to power generation and that is why you [people] are getting electricity at an affordable price...if you do not maintain austerity in using electricity, we cannot continue this subsidy anymore."

PM's Power, Energy and Mineral Resources Affairs Adviser Dr Tawfiq-e-Elahi Chowdhury also spoke on the occasion, while State Minister for Power, Energy and Mineral Resources Nasrul Hamid also attended the ceremony. 

Power Division's Secretary Md Habibur Rahman at the event highlighted the overall development of power sectors under the Awami League government.

Prime Minister's Principal Secretary Dr Ahmad Kaikaus conducted the ceremony at Ganabhaban.

A documentary on the newly-built five power plants was screened at the ceremony.

The five power plants are Bibiyana-3 400-MW Combined Cycle Power Plant in Habiganj, up-gradation of 150-MW Power Plant to 225-MW Combined Cycle Power Plant in Sylhet, Zulda 100-MW Power Plant Unit-2 in Chattogram, Meghnaghat 104-MW Power Plant in Narayanganj and Modhumoti 100-MW Power Plant in Bagerhat.

The prime minister observed that both solvency and purchasing power of people in rural areas have increased as they can now afford TV, refrigerator, and in many cases air conditioners too. "Their capacity has increased gradually and it has grown even more…it is now our desire that there will be no disparity and people will get every facility."

In this connection, she said the people will have to develop the habit of austerity as there is no disgrace if they exercise the practice of putting off the switch with their own hands after using electricity.

The premier also unveiled the cover of a publication titled "100" on the occasion of the birth centenary of Father of the Nation Bangabandhu Sheikh Mujibur Rahman.

The prime minister also emphasised giving importance to the environment while taking up any development project.

 "We must focus on the environment while taking up any project. We always should take protective measures before taking any step," she said.

Regarding the Covid-19 pandemic, she said the government is providing vaccines to people so that no one is left out of it, no matter what the cost is.

She reiterated her call to all to maintain health safety guidelines even after taking vaccines.

The premier said the development pace in the country has suffered a little setback owing to the pandemic, but it has not been halted, rather the wheels of the country's economy are running better than in other countries across the world.

Meanwhile in another programme, Nasrul Hamid, state minister of power energy and mineral resources, asked all power distribution companies to have an electric vehicle charging team at their companies.

While addressing a virtual programme titled "Guideline on Electric Vehicle Charging", he said "Electric vehicle is a most discussed issue in the world now. So, we need to take the necessary preparation on electric vehicle charging stations, its tariff and how this vehicle's overall information will be kept."

In a press release, referring to Sustainable and Renewable Energy Development Authority (SREDA), Power Division said that a petrol-run vehicle costs Tk5,375 to travel 1,000km while the electric one costs only Tk1,250.

However, SREDA Chairman Mohammad Alauddin told The Business Standard that it was an initial estimation and it needs more analysis.

Link to comment
Share on other sites

  • 1 month later...

https://thefinancialexpress.com.bd/national/cabinet-approves-660-megawatt-power-plant-project-in-munshiganj-1634475204

Cabinet approves 660-megawatt power plant project in Munshiganj

Published:  October 17, 2021 18:53:24

The Cabinet Committee on Government Purchase (CCGP) has approved a 660-megawatt power plant project to meet the country’s ever-growing demand for electricity.

The CCGP approved eight proposals, including setting up the power plant at Gazaria upazila of Munshiganj, on Sunday at its 35th meeting of this year held virtually with Finance Minister AHM Mustafa Kamal in the chair, reports BSS.

Briefing reporters virtually after the meeting, Cabinet Division Additional Secretary Md Shamsul Arefin said CCGP has approved the proposal of Bangladesh Power Development Board (BPDB) under the Power Division to build the gas or LNG-based combined cycle power plant at Meghnaghat area of the upazila which will supply the electricity to the national grid for 22 years.

He informed that consortium — Edra Power Holdings Sdn Bhd, Malaysia, and Winnievision Power Ltd, Bangladesh— placed the proposal to implement the project.

Mr. Arefin said the meeting also approved another proposal of BPDB to extend the existing contract for five years (17/03/2021 to 16/06/2026) to import 160 MW power from NTPC Vidyut Vyapar Nigam Limited (NVVN) of Tripura, India.

As per approval, he said, the tariff will be Tk 7.13852 per kilowatt hour and about Tk 41.88 billion will have to be paid in five years.

He informed that the meeting also approved the proposal of procuring 30,000 metric tons of bagged granular urea fertilizer from Karnaphuli Fertilizer Company Limited (KAFCO).

The meeting also approved the proposals of 30,000 metric tons bulk granular urea fertilizer import from Muntajat, Qatar and 30,000 metric tons bulk granular urea fertilizer import from Saudi Basic Industries Corporation (SABIC) through the national agreement.

He said the meeting also approved the proposal of procuring 2.0 million Novel Corona Virus RT-qPCR Diagnostic kits under three lots from Sterling Multi Technologies Ltd, Dhaka, OMC(Pvt) Ltd. Dhaka and G.S Biotech, Narayanganj with a cost of Tk 1.17 billion.

He mentioned that the CCGP also approved the proposal of procuring two bollard pool tugboats and necessary equipment and services from the Khulna Shipyard Limited with a cost of Taka 1.31 billion.

He said the committee approved the proposal for printing, binding and supply of free textbooks in five lots of Bengali and English versions for the primary level (3rd, 4th and 5th class) from Press Line Limited, Dhaka, Letter n Colour, Dhaka and Sedna Printing Press and Publications, Dhaka with a cost of Tk 80.60 million.

 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...